PAGE 164
ALMAC s.r.l.
If valve 6 is pressed, the right-hand track is moved in the direction indicated by the arrow;
If the valve is pulled, the movement is in the opposite direction.
Attention
: These manoeuvres can only be performed by technicians authorised by Almac S.r.l.
Attention
: Reset the valves 1-2-3-4 in the correct position at the end of any operation that involves
their handling.
Attention
: Danger of tipping over of the platform or crushing of the operators.
Содержание AlmaCrawler JIBBI 1250 EVO
Страница 40: ...PAGE 40 ALMAC s r l 1 2 3 1 2 3 ...
Страница 47: ...PAGE 47 ALMAC s r l ...
Страница 74: ...PAGE 74 ALMAC s r l ...
Страница 77: ...PAGE 77 ALMAC s r l 3 3 2 Radio mobile control push button panel if present ...
Страница 80: ...PAGE 80 ALMAC s r l 3 3 3 Push button panel display cable version and radio version ...
Страница 117: ...PAGE 117 ALMAC s r l 12V system fuse To determine the function of each individual fuse refer to the wiring diagram ...
Страница 210: ...PAGE 210 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity ...
Страница 212: ...PAGE 212 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Stamp and signature ...
Страница 228: ...PAGE 228 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment ...