1) BUILD
BOTTOM
2x 3-Ways
2x 90°
2x Depth poles
1x Width pole
1x C extender*
2) BUILD
REAR
2x 3-Ways
2x Height poles
1x Width pole
1x C extender*
3) BUILD
DEPTH
2x Depth poles
4) BUILD
FRONT
2x 3-Ways
2x Height poles
1x Width pole
1x C extender*
Cage assembly for EMT’s Purchased Locally
For pole count and lengths see
DIY Bay 1” EMT Pole Cutting Chart
*Co extender poles only
needed for bays larger than 10ft wide.
●
SkyRailPlus customers see
●
Insert poles 4 ½” into connectors as noted on
.
5