background image

ALL168250 QIG 

 

ALLNET GmbH © 2012 

www.allnet.de

   

I

MPORTANT 

S

AFETY 

I

NSTRUCTIONS 

 

This product is intended for connection to the AC power line. For installation instructions, refer to the 

Installation section. For removing the device, refer to the Unplug section. The following precautions should be 

taken when using this product. 

 

 

Please read all instructions before installing and operating this product. 

 

Please keep all instructions for later reference. 

 

Please follow all warnings and instructions marked on the product. 

 

Unplug the AC coupler from the wall outlet before cleaning. Use a damp cloth for cleaning. 

 

DO NOT use liquid cleaners or aerosol cleaners

.

 

 

DO NOT

 operate this product near water. 

 

The opening of enclosure near AC plug to face up or frontal, the connector face bottom or rear. 

 

 

This product should 

never

 be placed near or over a radiator, or heat register. 

 

This product relies on the building’s electrical installation for short-circuit (over current) protection.     

 

Ensure that a fuse or circuit breaker 

no larger than 120 VAC 20A or 240 VAC 16A

 is used on the 

phase conductors (all current-carrying conductors). 

 

DO NOT

 allow anything to rest on the product interconnect cords.   

 

DO NOT

 locate this product where people may walk on the cords. 

 

Because the 200Mbps PLC Ethernet Bridge product sends data over the powerline, it is recommended 

that you plug directly into a power outlet. Do not plug the device into a UPS or power strip with surge 

protection. The 200Mbps PLC Ethernet Bridge product has its own power filter for protection against surges. 

 

The product can be operated at an ambient temperature of 40

 

For pluggable equipment, the socket-outlet shall be installed near the equipment and shall be easily 

accessible. 

 

Only

 a qualified technician should service this product. Opening or removing covers may result in 

exposure to dangerous voltage points or other risks. 

 

Unplug the AC coupler from the wall outlet and refer the product to qualified service personnel for the 

following conditions: 

 

When the interconnect cords are damaged or frayed.

 

 

If liquid has been spilled into the product.

 

 

If the product has been exposed to rain or water.

 

 

If the product does not operate normally when the operating instructions are followed.

 

 

If the product exhibits a distinct change in performance.

 

 

Содержание ALL168250

Страница 1: ...ALL168250 QIG ALLNET GmbH 2012 www allnet de ALL168250 500 Mbps PLC Ethernet Bridge QUICK INSTALLATION GUIDE ...

Страница 2: ...500Mbps PLC Ethernet Bridge Network products Please read this document before installing the product TO THE INSTALLER This publication contains the following sections Important safety instructions The first thing you need to know before you begin to install Product installation guide Specification ...

Страница 3: ...AC 16A is used on the phase conductors all current carrying conductors DO NOT allow anything to rest on the product interconnect cords DO NOT locate this product where people may walk on the cords Because the 200Mbps PLC Ethernet Bridge product sends data over the powerline it is recommended that you plug directly into a power outlet Do not plug the device into a UPS or power strip with surge prot...

Страница 4: ...erver are installed No network protocols except Microsoft s TCP IP IPX SPX NetBEUI or Net BIOS support for IPX SPX are installed 3 Network installation requires two steps 1 Install the 500Mbps PLC Ethernet Bridge 2 For each PC to be added to the network repeat the process 4 Check that you have the following parts for each PC on the network Product installation guide for ALL168250 500Mbps PLC Ether...

Страница 5: ...net To share a xDSL or cable modem with Internet access service 1 Connect one Ethernet Bridge to the broadband router Plug the Ethernet Bridge into an AC outlet Plug the provided Ethernet cable into the RJ45 connector of the Bridge and plug the other end of the cable into an available Ethernet port of the Router 2 Connect the other Ethernet Bridge s to the PC s to share the Internet access Plug th...

Страница 6: ...56 1024 4096 QPSK BPSK ROBO Standards IEEE 802 3 IEEE 802 3U HomePlug AV Protocol Compliance with HomePlug 1 0 coexistence capability OS Microsoft Windows 2000 XP Vista Windows 7 for utility program only Nodes Up to 8 total devices IGMP IGMP Supports IGMP managed multicast sessions Encryption 128 bit AES Link Encryption with key management Port One 10 100 Mpbs Ethernet port Distance AC Wire 200 me...

Страница 7: ... connection quality is fair Red The Powerline connection quality is bad Off No Powerline Link detected ETH Green On Ethernet Link detected Blinking Ethernet traffic detected Off No Ethernet Link detected 1 The PWR LED indicator will blink in standby mode It will automatically get into standby mode if the Ethernet link is lost for 60 seconds If you unplug the Ethernet cable it will get into standby...

Страница 8: ...ng recording information recording or through retrieval systems without the express written permission of the owner Product specifications contained in this document are subject to change without notice All other company or product names mentioned are used for identification purposes only and may be trademarks of their respective owners Manufacturer ALLNET GmbH ALLNET Deutschland GmbH Maistrasse 2...

Страница 9: ...0 conforms to the Council Directives of 2004 108 EC EMC This equipment meets the following conformance standards This equipment is intended to be operated in all countries This declaration is made by ALLNET Computersysteme GmbH Maistraße 2 82110 Germering Germany Germering 10 02 2012 _______________________________ Wolfgang Marcus Bauer CEO EN55022 2006 A1 2007 CISPR I XX CDV Opt B EN 61000 3 3 20...

Отзывы: