background image

 

 

 

 

ALL168205 NANO Quick Installation      © 2012 ALLNET GmbH    All rights reserved          Page 3                                             

 

I

MPORTANT 

S

AFETY 

I

NSTRUCTIONS 

 

This  product  is  intended  for  connection  to  the  AC  power  line. For  installation  instructions,  refer  to  the  Installation 

section. For removing the device, refer to the Unplug section. The following precautions should be taken when using 

this product. 

 

 

Please read all instructions before installing and operating this product. 

 

Please keep all instructions for later reference. 

 

Please follow all warnings and instructions marked on the product. 

 

Unplug the  AC coupler from the wall outlet before cleaning. Use a damp cloth for cleaning. DO NOT 

use liquid cleaners or aerosol cleaners

.

 

 

DO NOT

 operate this product near water. 

 

 

This product should 

never

 be placed near or over a radiator, or heat register. 

 

This product relies on the building’s electrical installation for short-circuit (over current) protection.     

 

Ensure  that  a  fuse  or  circuit  breaker 

no  larger  than  120  VAC  20A  or  240  VAC  16A

  is  used  on  the  phase 

conductors (all current-carrying conductors). 

 

DO NOT

 allow anything to rest on the product interconnect cords.   

 

DO NOT

 locate this product where people may walk on the cords. 

 

Because the 200Mbps PLC Ethernet Bridge product sends data over the powerline, it is 

recommended that 

you  plug  it  directly  into  a  power  outlet.

  Do  not  plug  the  device  into  a  UPS  or  power  strip  with  surge 

protection. The 200Mbps PLC Ethernet Bridge product has its own power filter for protection against surges. 

 

The product can be operated at an ambient temperature of max. 40

 

For  pluggable  equipment,  the  socket-outlet  shall  be  installed  near  the  equipment  and  shall  be  easily 

accessible. 

 

Only

 a qualified technician should service this product. Opening or removing covers may result in exposure to 

dangerous voltage points or other risks. In any case of opening, warranty for the product will be lost. 

 

Unplug the AC coupler from the wall outlet and refer the product to qualified service personnel for the following 

conditions: 

 

When the interconnect cords are damaged or frayed.

 

 

If liquid has been spilled into the product.

 

 

If the product has been exposed to rain or water.

 

 

If the product does not operate normally when the operating instructions are followed.

 

 

If the product exhibits a distinct change in performance.

 

 

Содержание ALL168205NANO

Страница 1: ... 2012 All rights reserved by ALLNET GmbH Page 1 QUICK INSTALLATION GUIDE For ALL168205NANO 200Mbps PLC ETHERNET BRIDGE ...

Страница 2: ...tallation of the 200Mbps PLC Ethernet Bridge Network products Please read this document before installing the product TO THE INSTALLER This publication contains the following sections Important safety instructions The first thing you need to know before you begin to install Product installation guide Specification ...

Страница 3: ...ctors DO NOT allow anything to rest on the product interconnect cords DO NOT locate this product where people may walk on the cords Because the 200Mbps PLC Ethernet Bridge product sends data over the powerline it is recommended that you plug it directly into a power outlet Do not plug the device into a UPS or power strip with surge protection The 200Mbps PLC Ethernet Bridge product has its own pow...

Страница 4: ...ents except for Microsoft Network Client for Netware Networks or Microsoft Family Logon are installed No network services except file and printer sharing for Microsoft Networks or Personal Web Server are installed No network protocols except Microsoft s TCP IP IPX SPX NetBEUI or Net BIOS support for IPX SPX are installed 3 Network installation requires two steps 1 Install the 200Mbps PLC Ethernet ...

Страница 5: ...l be limited at 200 meter and for in house use only More than 200 meter will cause signal reduction or data loss The devices have to be operated on the same power phase in the building If using different power phases performance may be degraded or the connection may fail In this case it might be necessary to install a powerline phase coupler If you have any problems during installation or operatio...

Страница 6: ...on is established and starts blinking when data communication proceeds on Powerline The color of this LED shows the quality of the PLC link Green indicates a good connection speed orange is medium speed and red signals low connection speed The more exact speed values can be shown by the configuration utility 6 The ETH LED indicator is lit when the adapter has a working ethernet link and starts bli...

Страница 7: ...t Plug the provided Ethernet cable into the RJ45 connector of the Bridge and plug the other end of the cable into an available Ethernet port of the broadband router 2 Connect the other Ethernet Bridge to the wireless AP Plug the Ethernet Bridge into an AC outlet Plug the provided Ethernet cable into the RJ45 connector of the Bridge and plug the other end of the cable into the Ethernet port of the ...

Страница 8: ...16 64 256 1024 QPSK BPSK ROBO Standards IEEE 802 3az Ethernetphy HomePlug AV specification and IEEE1901 standard Co existence with Homeplug 1 0 Operating System Microsoft Windows 2000 XP Vista Windows 7 for utility program only Nodes Up to 8 total PLC devices IGMP IGMP Supports IGMP managed multicast sessions Encryption 128 bit AES Link Encryption with key management Push button NID RST button Por...

Страница 9: ...nge The Powerline connection quality is fair Red The Powerline connection quality is bad Off No Powerline Link detected ETH Green On Ethernet Link detected Blinking Ethernet traffic detected Off No Ethernet Link detected 1 The PWR LED indicator will blink in standby mode It will automatically get into standby mode if the Ethernet link is lost for 60 seconds If you unplug the Ethernet cable it will...

Страница 10: ... The PWR LED starts to blink Hint Please use an adapter that is plugged in close to the new adapter so you can observe the LEDs of both adapters at the same time Step 3 The new device starts to communicate with the device from existing private network and tries to join this existing private network After this process is finished ca 10sec the PWR LED will stop blinking and both adapters are perfomi...

Страница 11: ...04 A1 2010 IEC 61000 4 5 2005 IEC 61000 4 6 2008 IEC 61000 4 8 2009 IEC 61000 4 11 2004 EN 60950 1 2006 A11 2009 A1 2010 A12 2011 This equipment is intended to be operated in all countries This device has been tested and found to comply with the stated standard s which is are required by the Council Directive of 2004 108 EC and Low Voltage Directive of 2006 95 EC The test results are indicated in ...

Отзывы: