x930 Series Installation Guide for Virtual Chassis Stacking
195
Figure 92. Installing the AT-QSFPICU Cable in Port 1
3. Install the other end of the cable into a compatible port on another
networking device. If you are using the cards for the VCStack trunk,
the connections must crossover on the switches. Port 1 on the card in
one switch must be connected to port 2 in the next switch.
4. Repeat this procedure to install and cable a transceiver in the second
port.
5. If you are using the cards for the VCStack trunk, install and cable cards
in the other switches of the stack.
6. If you are using the cards for the VCStack trunk, go to Chapter 12,
“Building the Stack with AT-StackQS Cards” on page 159 after cabling
all the switches.
Содержание AT-x930-28GPX
Страница 8: ...Contents 8...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 82: ...Chapter 2 Virtual Chassis Stacking 82...
Страница 92: ...Chapter 3 Beginning the Installation 92...
Страница 102: ...Chapter 4 Installing the Power Supplies 102...
Страница 118: ...Chapter 7 Installing the Switch in an Equipment Rack 118 Figure 53 Attaching the Equipment Rack Brackets...
Страница 124: ...Chapter 8 Installing the Switch on a Wall 124 Figure 58 Minimum Wall Area Dimensions with the Front Panel on the Right...
Страница 214: ...Appendix A Technical Specifications 214...