Chapter 10: Displaying the AlliedWare Plus Version Number
146
7. Do one of the following:
If you need to upgrade the software on the switch, refer to the
Software Reference for x930 Series Switches, AlliedWare
Operating System
from
www.alliedtelesis.com
.
If you do not have to update the software, repeat the procedures in
this chapter on the remaining switches of the stack.
8. If there are no further switches, power off all the switches.
9. Go to one of the following chapters:
Chapter 11, “Building the Stack with SFP+ Ports S1 and S2” on
Chapter 12, “Building the Stack with AT-StackQS Cards” on page
Chapter 13, “Building the Stack with Copper or SFP Gigabit Ports”
Table 20. Hardware Options and Management Software Versions
Optional Hardware
Minimum Version of Operating
System
AT-StackQS Card and AT-
QSFPICU Cables
5.4.5
AT-StackQS Card and AT-
QSFPSR Transceivers
5.4.5-1
AT-StackQS Card and AT-
QSFPLR4 Transceivers
5.4.5-2
AT-x9EM/XT4 Card
5.4.5-2
Stack trunks of copper or SFP
Gigabit ports
5.5.1-2.1
Содержание AT-x930-28GPX
Страница 8: ...Contents 8...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 82: ...Chapter 2 Virtual Chassis Stacking 82...
Страница 92: ...Chapter 3 Beginning the Installation 92...
Страница 102: ...Chapter 4 Installing the Power Supplies 102...
Страница 118: ...Chapter 7 Installing the Switch in an Equipment Rack 118 Figure 53 Attaching the Equipment Rack Brackets...
Страница 124: ...Chapter 8 Installing the Switch on a Wall 124 Figure 58 Minimum Wall Area Dimensions with the Front Panel on the Right...
Страница 214: ...Appendix A Technical Specifications 214...