Section II: Installing the Chassis
91
Preparing the Equipment Rack
This section explains how to prepare the equipment rack for the chassis.
The procedure requires the following items:
#2 Phillips-head screwdriver (not provided)
Two equipment rack screws (not provided)
To prepare the equipment rack for the AT-SBx8112 Chassis, perform the
following procedure:
Caution
The chassis is heavy and should be mounted as low as possible in
the equipment rack to maximize vertical stability.
1. Reserve 311.1 mm (12.25“) of vertical rack space for the installation of
the AT-SBx8112 Chassis, as shown in Figure 27 on page 92.
2. Do not mount any other equipment within 152.4 mm (6”) above this
space during installation. This additional vertical space is temporary
and allows you enough room to lift and tilt the chassis into its position
in the equipment rack without hitting other equipment, as shown in
Figure 33 on page 99. You may use this additional space for other
network equipment after the chassis is installed.
Содержание AT-SBx81CFC960
Страница 14: ...List of Tables 14...
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 80: ...80...
Страница 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Страница 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Страница 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Страница 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Страница 272: ...272...
Страница 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...