79
Section II
Installing the Chassis
This section contains the following chapters:
Chapter 4, “Safety Precautions and Site Requirements” on page 81
Chapter 5, “Installing the Chassis in an Equipment Rack” on page 89
Chapter 6, “Installing the Power Supplies” on page 105
Chapter 7, “Installing the AT-SBx81CFC960 Control Card and Ethernet
Line Cards” on page 125
Chapter 8, “Installing the Transceivers and Cabling the Ports” on page
141
Chapter 9, “Powering On the Chassis” on page 171
Chapter 10, “Verifying the Hardware Operations of the Chassis” on
page 209
Chapter 11, “Troubleshooting” on page 215
Chapter 12, “Replacing Modules” on page 231
Chapter 13, “Upgrading the Controller Fabric Card” on page 263
Содержание AT-SBx81CFC960
Страница 14: ...List of Tables 14...
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 80: ...80...
Страница 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Страница 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Страница 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Страница 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Страница 272: ...272...
Страница 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...