SwitchBlade x8112 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section III: Building a Stack with VCStack Plus
303
Configuring the Second Chassis
Configure the second chassis by repeating the previous procedures,
starting with “Displaying the Management Software Version Number” on
page 289. Please note the following as you configure the second unit:
In “Displaying the Management Software Version Number” on
page 289, be sure that the management software on the switch is
version 5.4.5 or greater and that it is the same version as
management software on the first chassis.
In “Activating the VCStack Plus Feature License” on page 291, be
sure to assign the second chassis a VCStack Plus license.
In “Activating the VCStack Plus Feature License” on page 291, be
sure to check that the second chassis has the same licenses and
features as the first chassis.
In “Setting the ID Number” on page 297, be sure to assign the
second chassis a different ID number. For instance, you should
assign the second chassis the ID number 2 if the first chassis has
the ID number 1.
After configuring the second chassis, go to “Cabling the SFP+ Slots on the
Controller Cards” on page 304.
Содержание AT-SBx81CFC960
Страница 14: ...List of Tables 14...
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 80: ...80...
Страница 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Страница 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Страница 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Страница 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Страница 272: ...272...
Страница 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...