Chapter 12: Replacing Modules
242
Section II: Installing the Chassis
Figure 154. Reinstalling the Screws on the Positive and Negative
Terminals
8. Slide the plastic cover to the left and lightly tighten the two screws to
secure it in place. Refer to Figure 155 on page 243.
Caution
Do not over tighten the screws or you may crack or break the plastic
cover.
The plastic cover may not be present if the lead wires were connected
to the terminal block with the right angle terminals. If this is the case,
you may either skip this step or reinstall the plastic cover on the power
supply.
Содержание AT-SBx81CFC960
Страница 14: ...List of Tables 14...
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 80: ...80...
Страница 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Страница 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Страница 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Страница 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Страница 272: ...272...
Страница 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...