SwitchBlade x8112 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
Section I: Hardware Overview
23
Figure 2. Front View of the AT-SBx8112 Chassis
Note
Do not remove the shipping brace from the front of the chassis until
after the unit is installed in the equipment rack. You might bend the
chassis and cause misalignment of the slots and card guides if you
lift the chassis into the equipment rack without the shipping brace.
Shipping Brace
Slots for Ethernet
Line Cards and
Controller Cards
PoE Power
Supply Slots
Slots for Ethernet
Line Cards and
Controller Cards
System Power
Supply Slots
AT-SBxFAN12
Module
ESD Wrist
Strap Plug
Содержание AT-SBx81CFC960
Страница 14: ...List of Tables 14...
Страница 20: ...20...
Страница 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Страница 80: ...80...
Страница 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Страница 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Страница 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Страница 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Страница 272: ...272...
Страница 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...