Chapter 2: Installation
48
Unpacking the Switch
To unpack the switch, perform the following procedure:
1. Remove all of the components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. In addition to an AT-GS950/10PS, AT-GS950/16PS, AT-GS950/28PS,
or AT-GS950/48PS switch, verify that the shipping container includes
the following items shown in Figure 24 on page 49.
Содержание AT-GS950/10PS
Страница 6: ...Contents 6...
Страница 8: ...List of Figures 8...
Страница 10: ...List of Tables 10...
Страница 14: ...14...
Страница 40: ...Chapter 1 Overview 40...
Страница 58: ...Chapter 2 Installation 58 6 Go to Cabling the Switch on page 59...
Страница 68: ...Chapter 3 Troubleshooting 68...