48
48
11. Place the other two brackets on the top of the switch and mark the
screw hole locations with a pencil as shown in Figure 26.
x
Figure 26. Marking the Screw Hole Locations for the Top Brackets
12. Remove the two brackets and switch and set aside.
13. Pre-drill the marked locations on the wall at the locations marked in
Step 11 as follows:
a. For a wood wall, drill a 1.5mm (1/16”) pilot hole for screw. (No
anchors are required for mounting brackets on a wood wall.)
b. For a sheet rock, concrete or cinder block wall, drill a 6mm (1/4”)
hole for anchor.
14. If the wall you are mounting the unit on is wood construction, then
proceed to Step 16.
15. If the wall you are mounting the unit on is sheet rock, concrete or
cinder block construction, install the four plastic anchors into the wall in
the holes drilled in Step 11.
16. Slide the switch into the bottom brackets and place the other two
brackets on the top of the switch
17. Install the screws through the bracket holes to attach them to the wall.
Содержание AT-FS710/16
Страница 8: ...Contents 8 ...
Страница 10: ...Figures 10 ...
Страница 38: ...38 38 Figure 17 Aligning and Securing an AT FS710 5 or 5E Switch onto Wall Screws ...