50
50
Note
The screws and Phillip-head screwdriver are not included in the
shipping box with the switch or rack mount bracket kit.
AT-FS710/8 & 8E
Rack Mounting
Installation
This section explains the installation procedure for installing an
AT-FS710/8 or AT-FS710/8E switch in a 19-inch equipment rack using the
AT-RKMT-J08 rack mount kit.
“Unpacking the AT-RKMT-J08 Rack Mount Kit” on page 50
“Installing an AT-FS710/8 or /8E Switch Using the AT-RKMT-J08 Rack
Mount Kit” on page 51
Unpacking the AT-RKMT-J08 Rack Mount Kit
To unpack the AT-RKMT-J08 rack mount kit, perform the following
procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. Allied Telesis
recommends that you use the original shipping material to return the
unit to Allied Telesis if required.
2. Verify that all hardware components are included in your rack mount
package listed in Table 9.
Table 9. List of Components in the AT-RKMT-J08 Rack Mount Kit
Components
Two Short Metal
Brackets
Two Metal Handles
Two Metal Cable
Brackets
Содержание AT-FS710/16
Страница 8: ...Contents 8 ...
Страница 10: ...Figures 10 ...
Страница 38: ...38 38 Figure 17 Aligning and Securing an AT FS710 5 or 5E Switch onto Wall Screws ...