AT-10408XP 10-Gigabit Ethernet Switch Installation Guide
31
Unpacking the Switch
To unpack the switch, perform the following procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Ensure the following hardware components are included in your switch
package. If any item is missing or damaged, contact your Allied Telesis
sales representative for assistance.
Two rack-mount brackets
Eight rack-mount bracket screws (stainless steel)
One management cable
Four power cords (one each for North America, the UK, Europe,
and Australia)
Documentation CD
Содержание AT-10408XP
Страница 1: ...613 000707 Rev C 10 Gigabit Ethernet Switch AT 10408XP Installation Guide...
Страница 6: ...Contents 6...
Страница 8: ...Figures 8...
Страница 10: ...Tables 10...
Страница 26: ...Chapter 1 Overview 26...
Страница 44: ...Chapter 2 Installation 44...
Страница 46: ...Chapter 3 Troubleshooting 46...
Страница 50: ...Appendix A Technical Specifications 50...