Repairs
4 - 12
1.
Drain oil from winch, remove tube support bracket,
and covers as shown.
3.
Remove BRAKE-OFF, BRAKE, and X1 hoses.
4.
Remove motor tube assembly at Ports A and B on
the motor.
REMOVE HOSES
MOTOR TUBE
ASSEMBLY
MOTOR (REF)
5.
Remove remaining hoses.
6.
Remove the control manifold.
CONTROL MANIFOLD
2. Remove the two freespool hoses. (Other parts not
shown for view clarity.)
FREESPOOL
HOSES
FREESPOOL
ASSEMBLY (REF)
- Hydraulic System Disassembly
Содержание H6H
Страница 3: ......
Страница 9: ...vi Notes...
Страница 49: ...General 1 40 Notes...
Страница 65: ...General 1 56 Notes Notes...
Страница 71: ...Troubleshooting 2 6 Notes...
Страница 78: ...Section 3 3 7 Notes...
Страница 79: ...Service 3 8 Notes...
Страница 84: ...Section 4 4 5 Intentionally Blank...
Страница 92: ...Section 4 4 13 7 Remove the counterbalance relief manifold...
Страница 96: ...Section 4 4 17 Intentionally Blank...
Страница 98: ...Section 4 4 19 7 Separate the clutch hub and the pressure plate CLUTCH HUB PRESSURE PLATE...
Страница 102: ...Section 4 4 23 Intentionally Blank...
Страница 112: ...Section 4 4 33 Intentionally Blank...
Страница 120: ...Section 4 4 41 FREESPOOL HOSES BRAKE HOSE BRAKE OFF HOSE 6 Install freespool brake and brake off hoses...
Страница 126: ...Section 4 4 47 Intentionally Blank...
Страница 132: ...Section 4 4 53 Notes...