507867-02
Page 15 of 54
Issue 2128
DANGER OF EXPLOSION!
Fumes from PVC glue may ignite during system check.
Allow fumes to dissipate for at least 5 minutes before
placing unit into operation.
DANGER
1. Measure and cut vent pipe to desired length.
2. Debur and chamfer end of pipe, removing any ridges
or rough edges. If end is not chamfered, edge of pipe
may remove cement from fitting socket and result in a
leaking joint.
3. Clean and dry surfaces to be joined.
4. Test fit joint and mark depth of fitting on outside of pipe.
5. Uniformly apply a liberal coat of PVC primer for PVC
or use a clean dry cloth for ABS to clean inside socket
surface of fitting and male end of pipe to depth of fitting
socket.
NOTE:
Time is critical at this stage. Do not allow
primer to dry before applying cement.
6. Promptly apply solvent cement to end of pipe and
inside socket surface of fitting. Cement should be
applied lightly but uniformly to inside of socket. Take
care to keep excess cement out of socket. Apply
second coat to end of pipe.
7. Immediately after applying last coat of cement to pipe,
and while both inside socket surface and end of pipe
are wet with cement, forcefully insert end of pipe into
socket until it bottoms out. Turn PVC pipe 1/4 turn
Capacity
VENT
PIPE DIA.
(in.)
STANDARD
CONCENTRIC
Outdoor Exhaust
Accelerator
(Dia. X Length)
Outdoor
Exhaust
Accelerator
(Dia. X Length)
Flush
Mount Kit
1-1/2”
Concentric
Kit
2”
Concentric
Kit
3”
Concentric
Kit
1-1/2” X 12”
2” X 12”
51W11 **
71M80
or
+44W92++
69M29
or
+44W92++
60L46
or 44W93+
030
1-1/2
YES
YES
YES
2
YES
YES
YES
2-1/2
YES
YES
YES
3
YES
YES
YES
045
1-1/2
YES
YES
YES
2
YES
YES
YES
2-1/2
YES
YES
YES
3
YES
YES
YES
070
1-1/2
YES
YES
YES
2
YES
YES
YES
2-1/2
YES
YES
YES
3
YES
YES
YES
090
2
YES
YES
YES
2-1/2
YES
YES
YES
YES
3
YES
YES
YES
YES
110
2
YES
YES
YES
2-1/2
YES
YES
YES
YES
3
YES
YES
YES
YES
** Kit 51W11 is provided with a 1-1/2” accelerator which must be for all 2 and 2-1/2” PVC installations.
+ Termination kits 44W92 and 44W93 are approved for use in Canadian installations to meet CSAB149.
++ The 44W92 Concentric kit is provided with a 1-1/2” accelerator, which must be installed on the exhaust outlet when this kit is used
with this furnace.
NOTE
: When using 1-1/2” piping and terminating with a flush mount kit or concentric kit, the pipe must be transitioned to 2” pipe
before attaching to the flush mount kit or the concentric kit.
Table 3. Outdoor Termination Kits Usage