86
|
P a g e
TV
&
STEREO
TV
Antenna
Your
RV
is
equipped
with
a
Winegard
Air
360+.
The
unit
is
internet
ready
and
can
be
upgraded
easily
with
the
Winegard
Gateway
for
4G
LTE
&
WiFi
capabilities.
A
low
‐
profile
dome
that
requires
no
aiming
or
pointing
to
pick
signals
up.
Be
sure
to
read
the
full
manual
for
your
antenna
for
all
features
and
functionality.
An
initial
channel
scan
must
be
run.
Ensure
that
the
antenna
power
supply
is
in
the
on
position
and
the
green
light
is
illuminated.
A
scan
will
find
any
new
channels
that
have
been
added
in
your
area.
A
scan
should
be
run
when
you
travel
and
land
in
a
new
location.
Follow
the
channel
scan
instructions
for
your
TV
when
running
a
new
scan.
Rated
up
to
55
miles
(compared
to
35
miles
for
most
competition)
Filters
out
weak/unfunctional
tv
signals
Computer
printed
not
hand
pressed
antenna
(this
ensures
consistency)
Large
antennas
(Two
4G
antennas,
WiFi
extenders
with
the
longest
reach
in
the
industry)
Swappable
SIM
card,
certified
with
AT&T
and
Verizon.
Flexibility
of
use
Ethernet
port
availability
Functional
up
to
100
feet
around
your
RV
Unlimited
users
(tested
over
250
users
on
one
single
device)
Booster
Switch
Alliance
RV
has
hidden
the
booster
switch
behind
the
monitor
panel
and
tied
a
switch
to
the
booster
plate
for
ease
when
switching
between
AUX/SAT
and
TV.
Power
indicator
light
is
green
when
power
is
on.
NOTE:
For
information
on
connecting
to
the
to
the
AV
system,
see
the
plumbing
section
regarding
the
Nautilus
P4
Centralized
Docking
Station.
Содержание Paradigm
Страница 1: ...Obsessed with providing the best RV ownership experience OWNER S GUIDE Version 2 4 20 ...
Страница 103: ...97 P a g e AWNINGS CONTINUED Awning Component Breakdown GO TO TOP ...
Страница 126: ...120 P a g e PLUMBING AND UTILITIES CONTINUED Centralized Docking Station Continued Connecting to City Water GO TO TOP ...
Страница 127: ...121 P a g e PLUMBING AND UTILITIES CONTINUED Centralized Docking Station Continued Winterizing GO TO TOP ...
Страница 128: ...122 P a g e PLUMBING AND UTILITIES CONTINUED Centralized Docking Station Continued Winterizing Continued GO TO TOP ...
Страница 129: ...123 P a g e PLUMBING AND UTILITIES CONTINUED Centralized Docking Station Continued Winterizing Continued GO TO TOP ...
Страница 130: ...124 P a g e PLUMBING AND UTILITIES CONTINUED Rinsing Holding Tanks Tank Flush GO TO TOP ...
Страница 131: ...125 P a g e PLUMBING AND UTILITIES CONTINUED Rinsing Holding Tanks Tank Flush Continued GO TO TOP ...