Gas Requirements
70420301 (EN)
36
For converting Non-CE models from Natural Gas to
L.P. Gas:
50 Pound - M4979P3
75 Pound - M4454P3
F75 Pound - M4609P3
CE GASES refers to
Installing CE Gas Drying
Tumble Dryers
section, the above data does not apply
to the CE.
Turn on gas and check all pipe connections (internal
and external) for gas leaks with a non-corrosive leak
detection fluid. Purge air in gas service line by
operating the tumble dryers in the drying mode. If
burner does not light and unit goes into lockout, open
and close the door and restart. Repeat these steps until
burner ignites.
Use pipe compound, resistant to
actions of L.P. gas, on all pipe threads.
Figure 18
WARNING
Check all pipe connections, internal and
external, for gas leaks using a non-
corrosive leak detection fluid. To reduce
the risk of explosion or fire, DO NOT USE
AN OPEN FLAME TO CHECK FOR GAS
LEAKS! Gas connections should be
checked twice a year for leakage.
W635
TMB2317N
1
Gas Line to Tumble Dryer Controls
2
Gas Supply Piping System
3
Gas “T” Fitting
4
6 in. (152 mm) Minimum Gas Pipe
5
Gas Pipe Cap
6
Sediment Trap