66
505039
Section 5 Service Procedures
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the dryer(s) before servicing.
• Close gas shut-off valve to gas dryer(s) before servicing.
• Never start the dryer(s) with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the dryer is properly grounded.
W001R1
WARNING
j. Electric Models:
(1.) Remove two screws holding element and
plate to heater box, then pull element down
and away from heater box. See Figure 40.
(2.) Remove all wires from terminal block.
NOTE: Refer to wiring diagram when rewiring
terminal block.
(3.) Remove screw holding terminal block and
shield to rear bulkhead. See Figure 56.
(4.) While supporting bulkhead, remove the
four screws holding rear bulkhead to dryer
cabinet, then lift complete assembly out of
dryer. See Figure 53.
(5.) Remove heater duct from rear bulkhead.
See Figure 55.
k. To remove heater duct from rear bulkhead. See
Figure 55
HEATER
DUCT
ATTACHING
SCREWS
HEATER
DUCT
ATTACHING
SCREWS
HEATER
DUCT
REAR
BULKHEAD
D261SE3B