SECTION 1
SAFETY
075765
Page 24
Lifting Safety
OSHA has set forth guidelines which detail the use of Rigging Equipment for Material
handling. This guideline is found under
OSHA Standard Number: 1926.251
Please read and follow all guidelines found in this standard.
Removal from service.
Synthetic web slings shall
be immediately removed
from service if any of the
following conditions are
present:
OSHA 1926.251(e)(8)
ALWAYS do a thorough inspection of the slings, chains, and hooks before attempting
to lift the machine!
Содержание MP235
Страница 13: ...075765 Page 13 General Information Machine Dimensions 86 7 37 7 55 6 ...
Страница 15: ...075765 Page 15 General Information CE Declaration PENDING CE DECLARATION AT THIS TIME ...
Страница 17: ...SECTION 1 SAFETY 075765 Page 17 SECTION 1 SAFETY ...
Страница 30: ...SECTION 2 OPERATIONS 075765 Page 30 SECTION 2 OPERATION ...
Страница 38: ...SECTION 3 SERVICE 075765 Page 38 SECTION 3 SERVICE ...
Страница 50: ...SECTION 3 SERVICE 075765 Page 50 Control Lever Adjustment Jam Nuts A B Figure 3 5 Control Lever adjustment ...
Страница 58: ...SECTION 3 SERVICE 075765 Page 58 Battery Jump Start Figure 3 11 Battery Location and Terminals Battery ...