
Rockwell Automation Publication 20P-TG001C-EN-P - February 2018
65
Part Replacement Procedures
Chapter 3
11. Remove the five M3 x 6 mm screws and washers that secure the control
board to the control EMI shield and remove the control board.
Install the Control Circuit Board
Install the control board in reverse order of removal.
• Verify that all DIP switches are set to the correct configuration based on
your recorded settings (see page
11
Tightening torque:
1.0 N•m (8.9 lb•in)