
90
Rockwell Automation Publication 2100-IN012G-EN-P - August 2016
Chapter 7
Final Checklist Before Energizing
SecureConnect Unit Checklist
Verify these items before using a SecureConnect™ unit.
1. Make sure the stab lockout is pushed in.
2. Verify the disconnect handle is OFF/O.
3. Insert the tool in the shaft port and rotate the tool to the right.
The status indicator changes from green to red.
Stab Lockout
Status Port
Shaft
Port
Status Indicator
ATTENTION:
SecureConnect units are shipped inside the unit location with
stabs in the disconnected position. Prior to powering your horizontal bus,
you need to place all SecureConnect units in the connected position.
Содержание CENTERLINE 2100
Страница 4: ...4 Rockwell Automation Publication 2100 IN012G EN P August 2016 Summary of Changes Notes ...
Страница 106: ...106 Rockwell Automation Publication 2100 IN012G EN P August 2016 Chapter 10 Maintenance after Fault Condition Notes ...
Страница 108: ...108 Rockwell Automation Publication 2100 IN012G EN P August 2016 Chapter 11 Renewal Parts Notes ...
Страница 134: ...134 Rockwell Automation Publication 2100 IN012G EN P August 2016 Index Notes ...
Страница 135: ......