34
Rockwell Automation Publication 20Y-TG001C-EN-P - April 2017
Chapter 3
Component Test Procedures
Check the AFE Power
Structure
Fan Inverter Fuses
To check the AEF power structure fan inverter fuse, follow these steps.
1. Remove power from the AFE.
Remove Power from the AFE on page 37
.
2. If present, remove the protective barriers.
Remove AFE Protective Barriers on page 44
.
3. Remove the protective front cover and terminal cover from the power
Remove Protective Covers from the Power Structure on page 46
.
4. A pair of fuses (F1 and F2) feed DC bus power to the fan inverter.
a. Locate these fuses and remove them.
b. Use a multi-meter to verify that the fuses are not open.
5. Reinstall the good fuses and replace any open fuse with an equivalent-
rated fuse.
Содержание 20Y
Страница 10: ...10 Rockwell Automation Publication 20Y TG001C EN P April 2017 Preface Notes...
Страница 18: ...18 Rockwell Automation Publication 20Y TG001C EN P April 2017 Chapter 1 Troubleshooting and Error Codes Notes...
Страница 26: ...26 Rockwell Automation Publication 20Y TG001C EN P April 2017 Chapter 2 Active Front End System Overview Notes...
Страница 82: ...82 Rockwell Automation Publication 20Y TG001C EN P April 2017 Chapter 7 LCL Filter Component Section Notes...
Страница 86: ...86 Rockwell Automation Publication 20Y TG001C EN P April 2017 Chapter 8 DC Fuses Component Section Notes...
Страница 90: ...90 Rockwell Automation Publication 20Y TG001C EN P April 2017 Appendix A Service Tools and Equipment Notes...
Страница 112: ...112 Rockwell Automation Publication 20Y TG001C EN P April 2017 Appendix B Schematic Diagrams Notes...
Страница 133: ......