
Rockwell Automation Publication 1407-UM002B-EN-P - February 2019
127
CGCM-DLR Unit Startup
Chapter
5
Under-frequency (81U)
Follow these steps to test that the Under-frequency function is working properly.
1.
Connect a suitable load to the excitation output terminals of the
CGCM-DLR unit.
2.
Enable excitation in FCR mode.
3.
Clear the
EngineIdle
tag in the controller tag database.
4.
Apply simulated generator voltage signals by using the test voltage source.
5.
Adjust the simulated generator frequency below the under-frequency
setpoint.
6.
Verify that an under-frequency alarm is annunciated following the
expected delay.
Reverse Power (32R)
Follow these steps to test that the Reverse Power function is working properly.
1.
Apply simulated generator voltage and current signals by using the test
current and voltage source.
2.
Adjust the simulated real power until it exceeds the reverse power setting
in the negative direction.
3.
Verify that a generator reverse kW alarm is annunciated following the
expected delay.
Rotating Diode Monitor
Test this function after the generator is operating.
set-up procedures on
.
Содержание 1407-CGCM-DLR
Страница 1: ...Combination Generator Control Module Catalog Numbers 1407 CGCM DLR User Manual OriginalInstructions...
Страница 14: ...14 Rockwell Automation Publication 1407 UM002B EN P February 2019 Chapter 1 General Information Notes...
Страница 204: ...204 Rockwell Automation Publication 1407 UM002B EN P February 2019 Appendix B CGCM DLR Unit Math Models Notes...
Страница 220: ...220 Rockwell Automation Publication 1407 UM002B EN P February 2019 Appendix D Specifications Notes...
Страница 260: ...260 Rockwell Automation Publication 1407 UM002B EN P February 2019 Appendix G Installing the Add on Profile Notes...
Страница 266: ...266 Rockwell Automation Publication 1407 UM002B EN P February 2019 Index Notes...
Страница 267: ......