
124
Rockwell Automation Publication 1407-UM002B-EN-P - February 2019
Chapter 5
CGCM-DLR Unit Startup
Over-excitation Voltage (59F)
Follow these steps to test that the Over-excitation voltage function is working
properly.
1.
Connect a suitable load to the excitation output terminals of the
CGCM-DLR unit.
2.
Decrease the field over-excitation voltage setpoint to a level that causes an
alarm.
3.
Enable excitation in FCR mode with an FCR setpoint that produces a
field voltage higher than the over-excitation voltage setpoint.
4.
Verify that a field over-excitation voltage alarm is annunciated following
the expected delay.
5.
Reset the field over-excitation voltage setpoint to the desired level.
Generator Overvoltage (59)
Follow these steps to test that the Generator overvoltage function is working
properly.
1.
Set the generator overvoltage setpoint to a level that causes an alarm.
2.
Apply simulated generator voltage signals by using the test voltage source.
3.
To exceed the generator overvoltage setpoint, adjust the simulated
generator voltage.
4.
Verify that a generator overvoltage alarm is annunciated following the
expected delay.
5.
Reset the generator overvoltage setpoint to the desired level.
Содержание 1407-CGCM-DLR
Страница 1: ...Combination Generator Control Module Catalog Numbers 1407 CGCM DLR User Manual OriginalInstructions...
Страница 14: ...14 Rockwell Automation Publication 1407 UM002B EN P February 2019 Chapter 1 General Information Notes...
Страница 204: ...204 Rockwell Automation Publication 1407 UM002B EN P February 2019 Appendix B CGCM DLR Unit Math Models Notes...
Страница 220: ...220 Rockwell Automation Publication 1407 UM002B EN P February 2019 Appendix D Specifications Notes...
Страница 260: ...260 Rockwell Automation Publication 1407 UM002B EN P February 2019 Appendix G Installing the Add on Profile Notes...
Страница 266: ...266 Rockwell Automation Publication 1407 UM002B EN P February 2019 Index Notes...
Страница 267: ......