background image

ALL-ACCESS

 

Condensate Cleanout Device

 

Model AA1

 

  

INSTRUCTIONS

 

  

 

NOTE: Nitrogen & co2 pressure should be used by HVAC 
professionals ONLY.

 

 

Do NOT apply more than 30 psi to drain line in case of loose 
connections.

 

 

To prevent leaks, close cover securely & tighten cap after each use.

 

 

If full, water may drip when cover or cap are opened, have small pan 
ready.

 

 

Open cover to inspect & clean device at least every three (3) months.

 

 

Place instruction sticker (Included) in visible location.

 

  

To Install:

 

 

Install in ¾” or 1” (couplings not included) PVC drain line using PVC 

glue.

 

 

Be sure arrows are pointing away (downstream) from unit drain pan.

 

 

Install horizontally (preferred) or vertical ONLY if necessary.

 

 

Allow enough space above device to access valve & to open cover.

 

 

If installed in garage or attic, insulate device.

 

  

To clear drain line using nitrogen or co2:

 

Remove cap from valve, attach hose & blow out. Replace cap 
securely. 

 

FOR TOTALLY CLOGGED LINES some air & water may blow toward 
unit & out of cover.

 

This is a safety feature that protects drain lines from being blown 
apart.

 

In order to apply more pressure, you MUST lift out flapper holder by 
handle, insert adaptor into opening in direction to clear, attach hose to 
adaptor & blow out drain. Reinstall flapper holder, close cover 
securely.

 

  

Отзывы: