
4.4.4 Inspection after uncrating
When the equipment is placed in its intended location, always perform the
inspections listed below:
• Check the
A
measure.
• Make sure that all bolts are properly tightened.
• Make sure that the stands and feet are properly tightened.
NOTE
Some equipment is delivered with the stands disassembled.
• Check that connection piping can be removed to perform service.
• Make sure that there is enough space to remove plates on one side of the
plate heat exchanger.
200000420-4-EN-GB
34
4 Installation
EN
Содержание FrontLine ClipLine
Страница 1: ...Gasketed plate heat exchangers FrontLine ClipLine Lit Code 200000420 4 EN GB Instruction Manual...
Страница 10: ...200000420 4 EN GB 10 1 Introduction EN...
Страница 14: ...200000420 4 EN GB 14 2 Safety EN Safety...
Страница 39: ...200000420 4 EN GB 39 Installation 4 EN...
Страница 44: ...200000420 4 EN GB 44 4 Installation EN...
Страница 48: ...200000420 4 EN GB 48 5 Operation EN...