
4.2 Requirements
1
3
2
4
Space
See the delivered PHE drawing for actual measurements.
1.
Free space is required for lifting plates in and out.
2.
Free space is required for removing the tightening bolts. The size is
depending on the length of the tightening bolts.
3.
Supports for the guiding bar may be needed.
4.
Do not use fixed pipes or other fixed parts like feet, fasteners etc. inside
the shaded area.
Foundation
Install on a flat foundation designed for the equipment weight.
Elbow
To make it easier to disconnect the plate heat exchanger, an elbow should be
fitted to the connection in the pressure plate, directed upwards or sideways,
and with another flange located just outside the contour of the plate heat
exchanger.
Shut-off valve
To be able to open the plate heat exchanger, shut-off valves should be
provided in all connections.
Connection
Avoid excessive force on pipe connections.
200000420-4-EN-GB
25
Installation 4
EN
Содержание FrontLine ClipLine
Страница 1: ...Gasketed plate heat exchangers FrontLine ClipLine Lit Code 200000420 4 EN GB Instruction Manual...
Страница 10: ...200000420 4 EN GB 10 1 Introduction EN...
Страница 14: ...200000420 4 EN GB 14 2 Safety EN Safety...
Страница 39: ...200000420 4 EN GB 39 Installation 4 EN...
Страница 44: ...200000420 4 EN GB 44 4 Installation EN...
Страница 48: ...200000420 4 EN GB 48 5 Operation EN...