
5 — Installing and removing modules
2902 MainStreet Technical Practices
5-3
May 2002 90-2906-01
Figure 5-2 Opening the unit
5.3
Installing and removing primary rate modules
Each primary rate module has a female connector that fits onto a male connector on
the Control card. The modules are secured to mounting posts on the Control card
with screws. The holes in the module should line up with the posts. If they do not,
you are installing the module in the wrong location.
There are two jumper blocks for each primary rate module on the Control card. The
jumpers need to be configured for E1 G.703 and E1 HDSL LIMs. The jumper
configurations do not affect operations for other primary rate modules.
Procedure 5-2 To install E1 G.703 or E1 HDSL LIMs
You need a #2 Phillips screwdriver to install E1 G.703 or E1 HDSL LIMs.
1
Ensure that the unit is turned off and that the power cord is unplugged.
2
Open the unit.
3
Remove the screws from the appropriate Control card mounting posts.
4
Locate the jumper blocks on the Control card corresponding to the module position.
Jumper blocks J37 and J40 correspond to LIM P1; jumper blocks J41 and J44
correspond to LIM P2 (see Figure 5-3).
8975
Line-1
Slot 2
Slot 1
Line-2
Modem
Terminal
Rx-1
Tx-1
Rx-2
P1
P2
Tx-2
Alarm
Loop
Displa
y
Status
2
1
U
O
I
EDG
Sig/Gnd
Warning 1 —
Ensure that the power is off before inserting or
removing primary rate modules.
Warning 2 —
Electronic circuitry is easily damaged by electrostatic
discharge. Wear a properly attached antistatic wrist strap before
handling any electronic component. Handle modules by their edges.
Содержание MainStreet 2902
Страница 1: ...2902 MainStreet Network Termination Unit Release 1 0 H T E C H N I C A L P R A C T I C E S ...
Страница 40: ...3 Mounting the unit 3 8 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 50: ...4 Ground and power connections 4 10 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 68: ...6 Connecting to the network 6 4 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 90: ...7 Connecting to data devices 7 22 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 108: ...10 Node management 10 10 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 150: ...14 CPSS 14 6 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 168: ...16 E1 circuit operating parameters 16 4 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 218: ...20 Codirectional DCM 20 6 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 234: ...22 HCM rate adaption 22 10 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 246: ...23 Cross connecting circuits 23 12 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 254: ...24 Visual indicators 24 8 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 266: ...25 Alarms 25 12 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 278: ...26 System diagnostics 26 12 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 298: ...27 Loopbacks 27 20 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 332: ...Glossary GL 8 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 343: ......
Страница 344: ... 2002 Alcatel All rights reserved 90 2906 01 95 1820 01 00 C ...