Index
2902 MainStreet Technical Practices
IN-5
May 2002 90-2906-01
fault signalling
and protection switching, 23-6
E1 circuit, 16-2
format
E1 framing
CAS, 15-4
CCS, 15-4
frame fault class, 15-12
framing format
E1 (CAS), 15-4
E1 (CCS), 15-4
front panel
LEDs, 24-2
full duplex
RS-232 DCM, 18-4
fuse
testing and replacing, 31-3
G
grooming
CPSS, 29-5
ground points
EDG, 4-2
protective earth, 4-2
Sig/GND, 4-2
telecom safety earth, 4-2
grounding requirements, 1-11
grounding the unit, 4-2
group 1 one-way trunk conditioning, 15-9
group 2 one-way trunk conditioning, 15-10
group 3 one-way trunk conditioning, 15-11
H
HCM rate adaption
description, 22-2
to configure
data position, 22-9
HCM adaption, 22-3
interface speed, 22-8
signalling, 22-5
transport bandwidth, 22-4, 22-5
HDSL LIMs
equipment loopback, 27-16
line loopback, 27-18
HDSL overview, 1-6
header line (NMTI screen), 10-5
hop, 29-2
I
installation
desktop unit in slide assembly in a rack, 3-3
grounding requirements, 1-11
power requirements, 1-10
site selection, 1-9
space requirements, 1-10
tool and hardware requirements, 1-11
unit, 3-2
interface modules
2B1Q, 17-2
Codirectional DCM, 20-2
DNIC, 17-2
general description, 1-5
installing, 5-10
LEDs, 24-6
logical positions, 1-5, 12-2
maintenance information, 26-10
personality module pin and signal
assignments, 7-3
physical positions, 1-5, 12-2
removing, 5-11
resetting a module, 26-10
RS-232, 18-2
to view module status information, 12-7
V.35 DCM, 19-2
X.21 DCM, 19-2
interface speed
HCM rate adaption, 22-6
setting super-rate speeds (X.21 and V.35
DCMs), 19-14
super-rate
for DNIC or 2B1Q, 17-13
X.21 or V.35 DCMs, 19-13
to configure
HCM rate adaption, 22-8
inter-sector links, 13-10
intra-sector links, 13-10
J
J1 and J2 (personality modules)
pin and signal assignments, 7-3
J11 (external alarm equipment)
pin and signal assignment, 9-2
J3, J4, J5, J6, J7 and J8 (primary rate)
pin and signal assignments, 6-2
jumper blocks (for E1 G.703 or HDSL LIM), 5-3
Содержание MainStreet 2902
Страница 1: ...2902 MainStreet Network Termination Unit Release 1 0 H T E C H N I C A L P R A C T I C E S ...
Страница 40: ...3 Mounting the unit 3 8 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 50: ...4 Ground and power connections 4 10 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 68: ...6 Connecting to the network 6 4 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 90: ...7 Connecting to data devices 7 22 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 108: ...10 Node management 10 10 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 150: ...14 CPSS 14 6 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 168: ...16 E1 circuit operating parameters 16 4 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 218: ...20 Codirectional DCM 20 6 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 234: ...22 HCM rate adaption 22 10 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 246: ...23 Cross connecting circuits 23 12 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 254: ...24 Visual indicators 24 8 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 266: ...25 Alarms 25 12 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 278: ...26 System diagnostics 26 12 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 298: ...27 Loopbacks 27 20 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 332: ...Glossary GL 8 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Страница 343: ......
Страница 344: ... 2002 Alcatel All rights reserved 90 2906 01 95 1820 01 00 C ...