![Alcatel 7750 SR-12 Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/alcatel/7750-sr-12/7750-sr-12_installation-manual_2891366034.webp)
7750 SR-12 System Installation Process
Page 32
7750 SR-12
7750 SR-12 S
YSTEM
I
NSTALLATION
P
ROCESS
To install the 7750 SR-12 system, perform the installation procedures in the following order:
Step 1
Prepare the site.
Step 2
Unpack the chassis and components.
Step 3
Rack mount the chassis.
Step 4
If converting AC power, install the AC power shelf or shelves and AC power rectifiers.
Step 5
Make power connections.
Step 6
(Optional) You can either turn on the power now or after you install the SF/CPM, IOMs,
and MDAs.
Step 7
Install the SF/CPM(s).
Step 8
Establish console/Telnet connections.
Step 9
Preconfigure card slot, IOM, MDA, and port information.
Step 10
Install at least one IOM.
Step 11
Install at least one MDA.
Step 12
Connect network cables.
Содержание 7750 SR-12
Страница 1: ...7750 SR 12 INSTALLATION GUIDE Document Part Number 93 0019 01 December 2003 ...
Страница 6: ...Page 4 7750 SR 12 Table of Contents ...
Страница 14: ...Page 12 7750 SR 12 ...
Страница 84: ...Monitoring AC Power Page 82 7750 SR 12 ...
Страница 100: ...Establishing Router Connections Page 98 7750 SR 12 ...
Страница 150: ...Impeller Trays Page 148 7750 SR 12 ...
Страница 156: ...Cable Pin Assignments Page 154 7750 SR 12 ...