Metro Cell - Outdoor commissioning process
Purpose
This section describes the Metro Cell - Outdoor commissioning process. The Metro Cell -
Outdoor is self commissioning in the case of single device deployments. Where multiple
device deployments occur the operator may compliment zero-touch commissioning with
appropriate cell planning.
Troubleshooting
If any problems occur during the commissioning process refer to the following document:
•
Alcatel -Lucent 9364 Metro Cell - Indoor and Outdoor Troubleshooting,
401-387-076.
Commissioning process
The following steps outline the zero-touch commissioning process.
...................................................................................................................................................................................................
1
Power on the Metro Cell - Outdoor. After 1-3 seconds the power supply status indicator
will light up and the Ethernet port status indicator will flash green.
...................................................................................................................................................................................................
2
After approximately 2 minutes the 9363 Metro Cell will initialize and establish
connectivity. During this operation the System status indicator will blink slowly.
...................................................................................................................................................................................................
3
After the device has established a network connection the 9364 Metro Cell will
automatically update it's software. This process takes approximately 15 minutes. During
this operation both the System and Phone (device) indicators will blink.
...................................................................................................................................................................................................
4
Once the software update has completed the 9364 Metro Cell will carry out an automatic
reboot. During reboot the Power and System indicators will be on.
...................................................................................................................................................................................................
5
After rebooting the device will automatically auto-configure itself. During this operation
the System status indicator will blink slowly.
...................................................................................................................................................................................................
6
When the device is ready for use the Power, System and Phone (device) status indicators
will all be ON.
Metro Cell installation and commissioning
Metro Cell - Outdoor commissioning process
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
3-16
Alcatel-Lucent – Proprietary
Use pursuant to applicable agreements
Alcatel-Lucent 9364 MC
401-387-095
Issue 3
September 2011
E
N D
O F
S T E P S
...................................................................................................................................................................................................