
Result:
Requirement
SDH/PDH analyzer:
No errors
for 1 hour
Cleaning up
Perform the following to clean up the system:
•
Remove the cross connections made in
and
•
Disconnect the SDH/PDH analyzer.
Link testing exit checklist
Checklist
Verify that applicable procedures have been completed and fill-in the results. If a
procedure is not applicable, indicate “/A”.
Procedure
Result
(Passed, Failed, N/A)
Initials
Notes
Fiber connection
Remote login test
BER test
Link testing
BER test
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
365-313-103R8.0
Issue 2
July 2009
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
8-7
E
N D
O F
S T E P S
...................................................................................................................................................................................................
Содержание 1645 AMC
Страница 14: ......
Страница 20: ......
Страница 36: ......
Страница 50: ......
Страница 68: ......
Страница 106: ......
Страница 114: ......
Страница 164: ......
Страница 166: ......
Страница 174: ......
Страница 178: ......
Страница 182: ......
Страница 208: ......
Страница 216: ......
Страница 220: ......