10042022JA
U
-00232
5
Begin by first attaching the center points on both vertical (left/right) sides,
steps 1-2
. Then the center points on both
horizontal (top/bottom) sides,
steps 3-4
. Once all center points have been secured, make sure the screen material is
still within the marked areas before proceeding to attach the next springs.
Continue attaching the rest of the springs to the material in the following order in
steps 5-12
.
Note (after all springs have been attached):
Correct material installation
–Corners of the screen material are properly wrapped around the corner edges of the
frame and material is evenly tensioned and flat, creating a nicely taut surface.
Incorrect material installation
–The corners of the screen material are not properly wrapped along the edge of the
frame leaving the material with unbalanced tension and an uneven finish. To correct, detach springs from material
at the corner(s) where material does not lie flat along the edge of the frame, reposition the material so that it lies flat
and wraps along the edge of the frame, and reattach springs to the material.
How to avoid getting ripples on the screen’s material surface
Solution:
With the gloves on and assuring they are clean
,
pull and smooth out the material using your hand from
the center to the corners, creating a nicely taut surface as shown below.
Attention: Do not proceed with the Edge Trim installation until making sure there are no ripples in the material.
5
6
7
8
9
11
10
12
1
2
3
4
To avoid ripples forming in the material it is imperative that all of the corners are properly wrapped around the
edges as illustrated in the check mark diagrams.