background image

10042022JA 

                                              

www.akiascreens.com

                        

U

-00232 

Frame

 

Assembly 

Step 1

:  Place the included soft padded EPE sponge sheet on a clean area where the screen will be assembled. 

Step 2: 

Position the pieces of the frame on the EPE sponge in the arrangement shown below 

 

 

 

 

 

 

Step 3: 

Insert 

center joint (a/b) 

connectors into 

one-half of the horizontal frame (B/C)

 and secure with the 

M4x7 

screws (M)

 as shown in the illustration below.  

 

 

 

 

 

 

 

 

Step 4: 

Connect the 

elbow joints (c/d)

 to the top and bottom sections of the vertical frame. Once inserted, connect 

the vertical sections to the horizontal frame sections. Make sure all holes are in alignment and the frame pieces are 

flush (no gaps). They should form perfect right angles.  

 

 

 

 

 

 

 

 

 

 

Step 5

: Secure the elbow joints by fastening them with 

M4x7 screws (

g)

, 4 at each corner.

 

 
 
 
 

 

 

 

 

2. Hardware Parts List 

a. 

b. 

c. 

d. 

e. 

f. 

g. 

 

h. 

j. 

k. 

l. 

m. 

c. 

d. 

b. 

a. 

a. 

b. 

g.

g. 

Tip: The elbow joint (d) with the larger diameter holes should be on top.

 

Tip: The center joint (b) with the larger diameter holes should be on top. 

 

Содержание EDGE FREE CLR 2 Series

Страница 1: ...st dirt and scratches on the projection screen surface will affect the quality and performance of the projection image For optimal results we advise to pay attention to the following instructions 1 Use a dry microfiber cloth or soft brush to remove dust from the screen s surface 2 When cleaning use a damp microfiber cloth with warm water to remove any marks 3 Never rub or apply pressure when clean...

Страница 2: ...ints D5 top position 2 2 c Elbow Joints M4 bottom position 4 4 d Elbow Joints D5 top position 4 4 e Side cover Center Joints M4 2 2 f Side cover Elbow Joints M4 4 4 g M4x7 Screws 24 24 h Spring 88 104 i Spring Hook 2 2 j wall brackets 4 4 k Φ5x50 Wall Screws 8 8 l Hollow Wall anchors 8 8 m M4x4 Screws 24 24 n Angle cover 4 4 o Center Support Bar 1 1 p White gloves 2 2 q Spring 4 4 r Iron eyelet 88...

Страница 3: ...rews M as shown in the illustration below Step 4 Connect the elbow joints c d to the top and bottom sections of the vertical frame Once inserted connect the vertical sections to the horizontal frame sections Make sure all holes are in alignment and the frame pieces are flush no gaps They should form perfect right angles Step 5 Secure the elbow joints by fastening them with M4x7 screws g 4 at each ...

Страница 4: ...e in direct contact with the screen material to avoid puncturing it Center Support Bar Step 8 Insert the Center Support Bar o into the upper top groove on the back of the frame with the bottom end near the approximate center point of the frame and rotate it in at an angle so that both ends of the bar are in alignment with the groove Step 9 1 Insert iron eyelet through the CLR 2 material hole from ...

Страница 5: ...f the screen material are not properly wrapped along the edge of the frame leaving the material with unbalanced tension and an uneven finish To correct detach springs from material at the corner s where material does not lie flat along the edge of the frame reposition the material so that it lies flat and wraps along the edge of the frame and reattach springs to the material How to avoid getting r...

Страница 6: ...r other side Once both top and bottom edge trim frames have been connected attach the vertical left right sides edge trim frames d using the elbow joints f and secure with four M4x4 screws m on all corners Step 2 e m 1 1 2 2 2 2 f m ATTENTION The back of the material has labels indicating the TOP and BOTTOM The top edge trim piece with the logo should be installed at the top The material is direct...

Страница 7: ...each middle area to further support the bezel trim edge frame Notice to Installer Material Tip Proper Projector Placement for CLR 2 CORRECT The CLR 2 is exclusively for tabletop mounted ultra and short throw projectors INCORRECT Overhead placement or a standard projector will make the image very dark on account of the screen s absorbent layer deflecting light that is not aligned with its reflectiv...

Страница 8: ...in the M5x50 wood screws with a screwdriver Make sure the brackets are leveled Step 14 Position the fixed frame screen onto the top wall brackets fig 1 as shown below and push down at the center of the top of the frame fig 2 to secure For Technical Support or an Akia Screens contact in your area visit www akiascreens com Model Size X Wall bracket distance X1 Bracket hole distance Y Top Bottom Wall...

Отзывы: