5-19
Charging via Generator
The first step is making sure the battery disconnect
switch is on� All generator functions are controlled
via touchscreen input at the Multiplex panel� There
are a few options for charging the battery using the
generator, the simplest of which is to select BATTERY
TOP OFF from the home screen of the Multiplex panel�
Selecting the battery top-off icon starts the generator
and runs it until the battery reaches a 95% Start
of Charge� For additional information on generator
operation and charging using the generator,
NOTE
The system will only allow the generator to run
until the battery reaches a 95% SOC to avoid
running the generator indefinitely.
Charging via Alternator
The first step is making sure the battery disconnect
switch is on� The vehicle alternator will provide a
charge to the house battery� All switching is handled
automatically so one need only drive the coach to
provide a charge� Charge times will vary depending on
current SOC and environmental factors�
Charging via Solar Power
The solar charging system is primarily used to help
maintain a charge between shoreline or alternator
charging� The solar system is automated and does
not require input from the user� To view solar power
information select the Go Power icon from the Multiplex
electrical screen� The battery disconnect switch will
need to be in the on position for the system to accept a
charge from the solar panel�
The solar panels will not provide any charge to the
batteries if the battery disconnect switch is off�
NOTE
The solar panel and charge controller are designed
to help maintain a battery charge, and are limited
in their ability to provide a charge to the battery.
Additionally, the solar panel will not provide any
charge to the batteries if the battery disconnect
switch is off.
Содержание Rangeline 2023
Страница 1: ...2 0 2 3 R a n g e l i n e SCAN ME O w n e r s M a n u a l...
Страница 4: ...NOTES NOTES 2023 Rangeline NOTES NOTES...
Страница 6: ...2023 Rangeline 1 2 Introduction NOTES NOTES...
Страница 26: ...2023 Rangeline 3 12 General Information NOTES NOTES...
Страница 28: ...Floor Plans And Specifications 4 2 2023 Rangeline Floor Plan Rangeline...
Страница 76: ...2023 Rangeline 7 10 Ram Promaster Van NOTES NOTES...
Страница 100: ...Maintenance 9 14 2023 Rangeline 12 Volt Model Schematic MAIN CABIN AREA J4 13a J4 13b MD1 G12 M 1 BAT MULT TRN1...
Страница 101: ...Maintenance 2023 Rangeline 9 15 12 Volt Model Schematic SEE ROOF TV CAP BRN YEL 4 2a WHT 150 SW SW SW SW SW SW...
Страница 102: ...Maintenance 9 16 2023 Rangeline 12 Volt Model Schematic SW SW...
Страница 103: ...Maintenance 2023 Rangeline 9 17 12 Volt Model Schematic 1 4 7 10 2 5 8 11 3 6 9 12 13 14 15 1 4 7 2 5 8 3 6 9...
Страница 114: ...2023 Rangeline 9 28 Maintenance NOTES NOTES...
Страница 118: ...428 West Pike Street P O Box 629 Jackson Center OH 45334 0629 Phone 937 596 6111 Fax 937 596 7939 www airstream com...