AirSynergy3 Equipment Installation Guide
Page 23 | Commercial in Confidence SYN-UG-018
Figure 20
– Press down the locking mechanism with the slack band fed through
Figure 21 – Tighten clamps with large flat blade screwdriver
Figure 22 – AirSynergy mounting plate installed (large diameter concrete pole)