AirSpeed 1050 Installation Guide
DUG01545
Airspan Commercial and Internal Use
42
A Job Sheet
This job sheet enables the users to keep track of their installation. It covers all the prerequisites
required for accomplishing the AirSpeed 1050 installation.
Site Requirements
o
Pole or Wall for installation identified
o
Position on pole or wall identified
o
Access restrictions (highway regulations, other services on pole, power
pole)
o
Method of reaching desired positions (ladders, Elevated work platform)
o
Main fuse block available (where needed)
o
Configuration programming details known
o
All equipment items available at the installation site
o
AirSpeed 1050 unit + mounting kit
Tools
.)
o
Large flat screw driver for pole clamps
o
Small flat blade screw driver (insulated shaft recommended)
o
Appropriate wrench’s for unit assembly
o
Knife
o
pliers
o
Small side cutters
o
Tweezers (or fine blade long nose pliers)
o
Wire strippers
Required Ancillary Equipment
o
Laptop PC for initial configuration
o
cable for temporary connection of the lap top