3.Operation
3-13
5.
Once the engine has started up, leave it running to warm-up for 5 minutes.
The discharge air pressure gauge [B] in this condition ranges from
PDS400: 43 to 130PSI /
PDSF330: 43 to 174PSI
.
6.
After finishing warming up operation, open the service valve provided at the outlet of compressed
air and start service job.
Do not operate the machine with service valves and relief valve open unless air hoses
and/or pipes are connected.
High-pressurized air blows out and its air pressure could cause injury to the people
nearby.
When the machine has to be unavoidably temporarily operated with its port open, be
sure to mount a silencer to reduce noise and wear protective materials such as
earplugs to prevent damage to hearing.
Be sure to let unit warm-up after starting for smooth operation of the engine and the
compressor.
Do not operate the engine at full load immediately after it starts up. This will shorten
the equipment life.
A180436
B
Go
to
Discount-Equipment.com
to
order
your
parts
Содержание PDS400S-6E1
Страница 1: ...www discount equipment com G o to D iscount Equipm ent com to order your parts...
Страница 79: ...7 Specifications 7 5 7 3 Wiring Diagram A180195E 1 G o to D iscount Equipm ent com to order your parts...
Страница 80: ...7 Specifications 7 6 A180196E 1 G o to D iscount Equipm ent com to order your parts...
Страница 82: ...7 Specifications 7 8 PDSF330DP 6E1 A180444E G o to D iscount Equipm ent com to order your parts...
Страница 85: ...7 Specifications 7 11 7 4 2 Fuel Piping A180470E G o to D iscount Equipm ent com to order your parts...