5
PN 28141 REV. K [10/30/2018]
5. Locating the Unit - [See Table 1]
•
Locate furnace so flue connection to chimney is short,
direct and consists of as few elbows as possible.
• Centralize furnace location with respect to supply and
return air ductwork. Central location minimizes trunk
duct sizing.
•
All models may be installed on combustible floors.
6. Furnace Used In Conjunction With Air
Conditioning
• Install furnace in parallel with or upstream from
evaporator coil to avoid condensation in heat
exchanger.
• When installed in parallel, prevent chilled air from
entering furnace by use of dampers or air controlling.
• Manually operated dampers must have a control to
prevent operation of either system unless dampers
are in full heat or full cool position.
• Air heated by the furnace shall not pass through
evaporator coil unless coil is specifically approved for
such service.
• Check and adjust blower speed to compensate for
pressure drop caused by evaporator coil.
• Maintain required clearance between bottom of coil
drain pan and top of heat exchanger as specified by
coil manufacturer.
Table 1: Minimum Installation Clearance
s
Location
Clearance to Combustibles (Inches)
BCL-S and BFL
BCL High Capacity
Top
1
3
Bottom
0
0
S/A Plenum
1
3
Rear
6*
24
Side 1
6*
6
Side 2
24
18***
Front
24
24
Flue Pipe
9**
9**
Enclosure
Standard
Standard
* 24" Required Service Clearance
** 18" in USA
*** 18" Required on one side only for service to rear
Содержание BCL-190
Страница 30: ...30 PN 28141 REV K 10 30 2018 Model BCL High Capacity Diagram PARTS LISTING ...
Страница 33: ...33 PN 28141 REV K 10 30 2018 Model BCL S Diagram Fan and Limit Control Shown PARTS LISTING ...
Страница 38: ...38 PN 28141 REV K 10 30 2018 PARTS LISTING Model BFL Diagram Fan and Limit Control Shown 33 ...