Gasguard
®
250 VMB System Installation Manual
Air Products and Chemicals, Inc.
Page 6 - 4
AIR PRODUCTS VALVE MANIFOLD BOX FIELD START-UP CHECKLIST
page 1 of 6
CUSTOMER __________________VMB # _____________ SERIAL #___________
DEVICE DESCRIPTION __________________________________MODEL# _____________
GAS TYPE ___________________START DATE ___________ FINISH DATE ________
TOOL NAME ____________________ TECH REP _________________________________
CUSTOMER SYSTEM LABEL ___________________________________________________
VISUAL INSPECTION
PIPING/MECHANICAL
Check off line item when completed
Sign and date when section completed
Branch A-D Left
Branch E-H Right
Verify VMB facilitation complete by
DWG#____________
VMB labeled correctly per associated parent
document # See section 6
No nylon collars stripped
VMB information received (SEMC inspection and
test, functional test, owners manual ) ( circle )
All open connections sealed
General appearance satisfactory
Panel analyzed for contaminants See sections 3 and 4
SEMC See attached Gasguard inspection and test sheet
Verify leak test from gas bottle to P.O.U. complete
Verify corrosive or toxic scrubber and incinerator
operational and running
Pitot tube installed with correct 90
°
orientation
Tel tails installed
Verify exhaust line functioning
Panel under pressure 20 psig > < 25 psig
Visual welds satisfactory See section 1
SEMC See attached Gasguard inspection and test sheet
All panel valves labeled per parent doc See section 6
SEMC See attached Gasguard inspection and test sheet
Valve flow path correct See section 1
SEMC See attached Gasguard inspection and test sheet
Manual valve handles correct color See section 6
SEMC See attached Gasguard inspection and test sheet
Trickle purge gasket installed (.007/ .010)
Correct venturi pressure present min. 75 psig
Correct pneumatic pressure present 75 psig to 95 psig
Purge cylinder installed
Gas detection system operational
Secondary containment installed
Verify and record flow switch rating See section 1
SEMC See attached Gasguard inspection and test sheet
1st branch flow switch rating
2nd branch flow switch rating
3rd branch flow switch rating
4th branch flow switch rating
SECTION COMPLETED SIGNATURE__________________ DATE ________
Notes:___
______________________________________________________________
Содержание Gasguard 250
Страница 3: ......
Страница 9: ...Gasguard 250 VMB System Installation Manual Air Products and Chemicals Inc Page i 2...
Страница 50: ...Gasguard 250 VMB System Installation Manual Air Products and Chemicals Inc Page 5 6...
Страница 60: ...Gasguard 250 VMB System Installation Manual Air Products and Chemicals Inc Page 6 10...
Страница 68: ...Gasguard 250 VMB System Installation Manual Air Products and Chemicals Inc Page A 8...