![Air Liquide MONNAL T75 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/air-liquide/monnal-t75/monnal-t75_user-manual_2874996023.webp)
3 Installation and commissioning
1.
To confirm, press
[Validate]
;
Note:
Remember to seal off the Y-piece of the patient circuit.
Otherwise, press
[Cancel]
.
2.
To interrupt the test, press
[Stop]
and then
[Finish]
.
3.
To start the test again, press the
[Restart]
button, and then
[Validate]
. At the point where tests
have been completed, a window opens, indicating that the plug should be removed from the
patient circuit Y-piece, accompanied by an audible reminder every 2 minutes.
Note:
If the user does not unblock the patient circuit after 20 minutes, the test is stopped.
Press
[Re-start]
to resume the last step of the automatic tests.
If the automatic tests fail with the message
«Circuit resistance not evaluated»
:
•
check the consistency between the patient category selected and the patient circuit used,
•
check that the patient circuit is properly connected to the device,
•
check that the filters and other accessories used do not cause too high a resistance.
CAUTION:
Make sure that the patient category selected corresponds to the patient circuit
and the accessories used (see New patient / Category selection on page 29).
For a full description of the automatic test, see Technical description on page 102.
3.2.9 Transport on the rolling stand
When moving
Monnal T75
Monnal T75 on its stand, place both hands on the handle to push it safely:
23