Air Creation IXess 13 Скачать руководство пользователя страница 37

Appendix 

7.1 

Wing Inspection Forms 

7.1.1 

iXess 13 Wing Frame Stage Inspection (1) 

Wing serial number and registration: _________________________________________  

General 

This stage inspection should be carried out when the wing frame has been 
assembled and is ready to be fitted in the sail. It is not possible to properly 
inspect once the sail has been fitted. 

Inspection schedule 

Nose plate assembly _____________________________________________ Sat / Unsat 

General assembly correct (check with drawings M030) ________________________

               

Plastic spacer washers in position between plates and tubes _____________________

               

Check for over tightening (distortion of plates/tubes) __________________________

               

Length of the thread of bolt B168710 (nut not tightened at this stage) _____________

               

Correct position of nose-catch rail (pointing rearward from the bolts) and catch 
bolt _________________________________________________________________

               

Nose batten stop plug fitted and secure _____________________________________

               

Leading edges __________________________________________________ Sat / Unsat 

Inspect both forward sections for damage and straightness ______________________

               

Inspect both rear sections for damage and straightness _________________________

               

Keel __________________________________________________________ Sat / Unsat 

Inspect for damage and straightness________________________________________

               

Hang bracket fit and orientation (hang bolt hole on rear face) ____________________

               

Forward hang point position used (middle for the training version) _______________

               

Stop rings not over tightened _____________________________________________

               

Kingpost fitting correctly assembled and not over tightened _____________________

               

6  Length of the thread of bolts B167010 (fixing nuts on tensioning rail not 

tightened at this stage) __________________________________________________

               

“Prop tape” protection patches R108810 fitted and correctly positioned____________

               

Cross-tubes central junction _______________________________________ Sat / Unsat 

Check cross tubes for damage and straightness _______________________________

               

Correct fitting of webbing hinge D074330___________________________________

               

3  Check that the cross-tubes are free to rise up, limited by the keel protection 

sleeve _______________________________________________________________

               

4  Correct assembly order of stainless plates (no stagger, check with drawings 

M040)_______________________________________________________________

               

Thread showing through each nut on bolts B069410 (just) ______________________

               

Centre bolt B086710 not over tightened (cables should wiggle freely), correct 
length of aluminum spacer D252300 _______________________________________

               

Tension cables direction (plastic over sleeves forwards) ________________________

               

Leather/webbing protection sleeve D074327 correctly fitted and screws in _________

               

Check ball and socket for damage/distortion _________________________________

               

GDMMIX13-1G Version 

0010 

37 

Содержание IXess 13

Страница 1: ...3 1G Version 0010 1 Maintenance Manual Wing Type I IX Xe es ss s 1 13 3 A rodrome de Lanas 07200 Aubenas France Telephone 33 0 4 75 93 66 66 Fax 33 0 4 75 35 04 03 info aircreation fr http www aircrea...

Страница 2: ...5 5 Tensioning U channel 7 3 5 6 Control Frame 7 3 5 7 Leading Edge 7 3 5 8 Cross Bars 8 3 5 9 Battens 8 3 5 10 Top and Bottom Side Wires 8 3 5 11 Top and Bottom Front Back Wires 8 3 5 12 Reflex Brid...

Страница 3: ...Procedure 17 5 2 2 Wing Reassembly Procedure 18 5 2 3 Sail Reinstallation 23 5 3 Inspection Notes 30 5 3 1 Tubing 30 5 3 2 Bolts 31 5 3 3 Cables Terminals 32 5 3 4 Sail 32 5 3 5 Special Purpose Equipm...

Страница 4: ...ents to this manual will be issued on the Air Cr ation website http www aircreation fr in PDF format This should be printed out and added to the manual The amendment table should at that time be updat...

Страница 5: ...worthiness of the aircraft depends on the competence of the person performing the maintenance If there are any doubts regarding the required and appropriate maintenance then an Air Creation technical...

Страница 6: ...llowing conversion factors are presented as a ready reference to the conversion factors that have been used in this manual 1 Pound lb 0 4536 Kilogram kg 1 Pound per sq in psi 6 895 Kilopascal kPa 1 In...

Страница 7: ...he wing which supports the reflex bridles the top front and back wires and the top side wires The king post works in compression and is secured to the keel using a locating foot The main material is 6...

Страница 8: ...n of the wing Do not fly the wing with any other batten profile than that supplied by Air Creation as variation may have serious effects on flight performance and stall characteristics of the wing 3 5...

Страница 9: ...d Mylar material making up the leading edge areas The sail is constructed from many individual panels which are sewn together using polyester thread to form the required shape The sail has attachment...

Страница 10: ...ve been used as protection on the rear of the front leading edges 8 Insert rear leading edges in the tips opening of the sail with the plastic lugs at the rear of the tubes positioned horizontally and...

Страница 11: ...age to the airframe during transport 3 7 Ground Handling The wing should only be moved when properly packed or if necessary when attached to the trike When moving the wing in the assembled position it...

Страница 12: ...igue life of these components is dependent upon rigid adherence to maintenance schedules Air Creation will from time to time amend these maintenance checks as the service history of the aircraft evolv...

Страница 13: ...h pins 2 4 2 4 2 4 Outer part of leading edges 4 4 Keel and visible tubing 2 3 2 3 2 Hang bracket for condition deformation 2 3 2 3 2 4 Main hang bolt 2 4 2 4 2 6 Nose assembly U channel and cable goo...

Страница 14: ...ted carefully for any permanent deformation of the U bracket the main bolt or the keel as well as all of the other effected components If the landing resulted in a jolt on the ground then a 300 hour o...

Страница 15: ...and then approximately turn more should be made The resulting fit should not allow any axial movement of the bolt in its location but will allow rotation using fingers of a held component to be achiev...

Страница 16: ...n of the tubes Elongation of bolt holes Damaged wires Replacement of all bolts nuts and push pins Damage to sail Factory test on one of the sailcloth samples Special Requirements and Tips When install...

Страница 17: ...and uprights Dismantle the bolts fixing the lateral lower cables on the control bar Dismantle the bolts fixing the uprights on the upper U brackets and remove the U brackets from the RAP Remove the bo...

Страница 18: ...erefore matched to each cross tube The inner sleeve in the cross tubes is constructed by slicing the same tube as the outer tube squeezing it down and inserting it in the outer tube Therefore the spli...

Страница 19: ...de of those i e not staggered 8 x 18 Stainless steel washers B810810 are used between the parts on the central bolt The crossbar securing lugs I220021 are attached to the keel protection sleeve do not...

Страница 20: ...d rear Examine the holes close to the outer end where the cross tubes attach the smaller 8mm hole should be turned to the outside of the frame with the larger 10mm hole turned to the inside Place the...

Страница 21: ...ss tubes and carefully secure them with a self tapping screw B199010 into the hole in the cross tube placing a countersunk washer M6 B830610 between the screw and the back up pull back bridle Figure 5...

Страница 22: ...nsert all bolts in the vicinity of the hang bracket from the left to ease pre flight checks Apply threadlock to the bolts screw CHC 6 80 B068310 and tighten gently Do not over tighten the adjustment s...

Страница 23: ...the cross tubes on top Figure 5 11 Figure 5 12 2 Fitting the Sail to the Airframe Lay out the sail in a straight line back from the end of the leading edges with the nose towards the structure The up...

Страница 24: ...t all the tubes have passed down the leading edge side of the membrane Now remove the protective packing from the ends of the keel and leading edges 3 Top Rigging The upper rigging is attached to the...

Страница 25: ...ith the adjusting screw HM 6 45 B126410 so that the bolts screw FHC 6 70 B167210 are at the end of the slot Insert the tips into the leading edges if not already in place The tip position indexer D128...

Страница 26: ...through the kingpost hole Figure 5 18 Thread the upper rear wire D206567 through the anti chafe leather boot D074810 Figure 5 19 Figure 5 19 Pass the pull back cables D204590 through the boot D074810...

Страница 27: ...to the hang bracket on the keel Refer to drawing OP10 32MO Apply threadlock and tighten the upright securing bolts screw BHC 8 63 13 B086313 Also tighten the main bolt screw CHC 10 125 15 B112810 Do...

Страница 28: ...but there are plenty of battens to do Once you have got the tensions correct tie a second knot a couple of inches further down the string to form a convenient handle and cut the remainder off Note th...

Страница 29: ...me and attach the nose catch Place the wing on its nose Install the undersurface battens The recesses in the batten tips should seat against the underside of the leading edges Attach the Velcro holdin...

Страница 30: ...rrounding areas for cracks during scheduled inspections Ensure that the areas are clean A 10X magnifying glass and good lighting will improve this visual inspection for cracks General Care The tubes c...

Страница 31: ...ir tubing Always replace with a genuine new part 5 3 2 Bolts All airframe bolts are High Tensile Bolts If it is necessary to replace any bolts or nuts it is important that the specifications of the or...

Страница 32: ...nts nose keel end tips are not damaged or worn Check all inspection zippers to see if they function smoothly and close completely Fabric samples are stitched in the middle of the sail and above the ke...

Страница 33: ...they are removed and installed The bars are port and starboard sides and need to be installed on the inside of the down tubes They should be inspected for bending and at each of the bolt holes and we...

Страница 34: ...djusted and their primary effect is for stability outside the normal flight envelope so adjustment for flight within the envelope is pointless anyway The internal membrane is designed to be adjustable...

Страница 35: ...rect adjustment Always proceed in the opposite direction on the sleeves of each half wing Separate the strings holding the tip adjuster s last straight batten and detach the Velcro patches joining the...

Страница 36: ...range efficiency 35 km h 22 mph in one seater configuration 25 km h 15 mph with two people aboard For this adjustment more tension has to be put in the acting cable by moving upward the stop of the ca...

Страница 37: ...___ 2 Hang bracket fit and orientation hang bolt hole on rear face ____________________ 3 Forward hang point position used middle for the training version _______________ 4 Stop rings not over tighten...

Страница 38: ...itting and orientation No2 D203668 nearest to hinge Top rigging not fitted at this stage ____________________________________________ Wires _________________________________________________________ Sa...

Страница 39: ...positioned seam rearwards _______ Keel nose assembly ______________________________________________ Sat Unsat 1 Refer to drawing M030 and check area for correct assembly and security of all fastening...

Страница 40: ..._____________ Sail trailing edge ________________________________________________ Sat Unsat 1 Refer to paragraph 5 2 3 13 batten strings and check that all batten strings are correctly tied and tensio...

Страница 41: ...roceed with a second person One stays at the leading edge the other holding down the inner surface panel Fold the leading edge which is stiffened by the Mylar insert onto the sail 5 Take the keel pock...

Страница 42: ......

Страница 43: ...Maintenance Operation Board Wing Type ______________________ Serial Number _________________________ Date Hours Flown Type of Operation Performed Operator Name Address Stamp GDMMIX13 1G Version 0010...

Страница 44: ...GDMMIX13 1G Version 0010 44 Date Hours Flown Type of Operation Performed Operator Name Address Stamp...

Отзывы: