E
Checkout Log
E.1 Installation
1.
The installation has been performed in accordance with the instructions shown in
this manual.
2.
Wiring checks have been performed.
3.
Connector engagement checks have been performed.
E.2 Ground Checks
1.
Serial interface check has been performed.
2.
Lighting and controls have been checked.
3.
Discrete inputs have been checked.
4.
Interference checks have been performed.
5.
Version check has been performed.
E.3 Device Configuration
1.
The device has been configured according to requirements for this specific
installation.
E.4 Documentation
1.
Aircraft documentation updated.
2.
All documentation, including this log and the configuration log has been docu-
mented and stored.
I hereby confirm the above mentioned steps have been completed and that no issues,
problems or failures have been found.
Name, date, signature
52
ATD
·
Installation Manual
·
rev. 3.0
·
2019/05/09