background image

XJ3000 Series

Entry-Level SAS/SATA 6G JBOD

Chssis Quick Installation Guide

Document Number : QIG-00012-A

P/N :H883JG6000-00050-0

Backplane
Slide rail

To install the backplane, please refer to the backplane installation

guide in the accessory box.

To install the slide rail, please refer to the manual in the slide rail kit.

B-2. Insert the drive carrier into its bay. Push the tray lever until it clicks. Make sure the 

      drive tray is correctly secured in place when its front edge aligns with the bay

      edge.

B-1. Place the 2.5” HDD on the tray and then secure it with four screws on the bottom.

A. Release a drive tray by pressing the unlock button and pinching the lock lever 

     slightly and pulling out the drive tray.

 Installing the HDD

A. Place the 3.5” HDD on the cage and fix HDD with 4 screws on both sides of HDD tray.

B. Insert the drive carrier into its bay. Push the tray lever until it clicks. Make sure the 

    drive tray is correctly secured in place when its front edge aligns with the bay edge. 
* All 3.5” hot-swap HDD can also fit 2.5” HDD or SSD by additional 2.5” HDD converted 

   bracket purchasing.

A

B-1

B-2

Install 3.5” Hot-swap HDD

A. Place the 2.5” HDD into the converted bracket and secure it with 2 screws.

B. Place the 2.5” HDD on the cage and fix the HDD with 4 screws (B-1) on both sides  

    of the HDD tray (B-2). 

Install 2.5” Hot-swap HDD

A

B-1

B-2

Install 2.5” Hot-swap HDD

A

B-1

B-2

 

 

 Front Panel Controls and Indicators

HDD Power LED (Behavior: power-on: blue/active: blink)

HDD Failed LED (Behavior: red)



Mute button

Power LED

Alert LED

Temperature LED

Fan LED

XJ3000-2242

2U 24Bay SFF 6G JBOD

XJ3000-2123

2U 12Bay 6G JBOD

XJ3000-3163

3U 16Bay 6G JBOD

XJ3000-4243

4U 24Bay 6G JBOD

3.5” HDD Tray

2.5” HDD Tray

 Rear Panel Controls and Indicators



Two(2) x hot-swap blowers
Power on/off switch
Hot-swap 500W high-efficiency power

supply module
2 x 24Gb/s Mini SAS ports with single 

expanders 

4 x 24Gb/s Mini SAS ports with dual 

expanders
Serial port for console monitoring

XJ3000-2123 & XJ3000-2242 Rear View



Three(3) x hot-swap fans
Power on/off switch
Hot-swap 500W high-efficiency power supply module

2 x 24Gb/s Mini SAS ports with single expanders 
4 x 24Gb/s Mini SAS ports with dual expanders

Serial port for console monitoring

XJ3000-4243 Rear View

XJ3000-3163 Rear View

 Installing or Replacing the Fan/Blower

A. Release the thumb screw(s) on the fan/blower module.

B.  Hold the thumb screw firmlyand pull the fan/blower module out of the JBOD. 

A

B

 Installing or Replacing the Power Supply

A. Release 1 screw from each power module on the rear panel. 

B. Hold the PSU lever and firmly pull the PSU out of the chassis.

A

B

 Connecting the JBOD to the Host

A. Plug the cable into the connectors on the host and UP link on the primary ports

     of the JBOD.
B. Turn the JBOD power switches on. It might take few minutes to turn on completely.  
C. MUST wait until the JBOD is completely turned on before turning on the power 

     to the host. 

UP

Host

DOWN

PRIMARY

Expand to another JBOD

Power Switches

 Installing 2nd Expander Module Kit

A. Install the secondary expander module by attaching the connectors on the 

     backplane to the expander module.
B. Tighten the thumb screws and connect the SAS cables for uplink and downlink 

     on the expander module. 
C-1. For 2U JBOD, align the holes on the interposer board with the holes on the 

     chassis. Tighten the screws to secure the board to the chassis. Last, connect the

     SAS cables to the interposer board.
C-2. For 3U/4U JBOD, align the holes on the interposer board with the holes on 

     the bracket holder. Tighten the screws to secure the board to the holder. 

     Align the bracker holder to the chassis and tighten with screws. Last, connect the

     SAS cables to the interposer board.
D.  Insert one end of the console cable into COM2 port on rear panel and the 

     other end of the cable to the expander module (match the pin2 on J2 connector

     with the “ ” sign on the cable).

B

 

 

A

B30

B31

F

B30

B31

F

Primary

Secondary

Expander Module 
Rear View

19

20

B1

A1

A30

B31

A60

B60

A31

M

B1

A1

A30

B30

B31

A60

B60

A31

M

B1

A1

A30

B30

B31

A60

B60

A31

M

B1

A1

A30

B30

B31

A60

B60

A31

M

 

 

C-1

 

UP

DOWN

SECONDARY

COM2

C-2

 

UP

DOWN

SECONDARY

COM2

1

2

5

6

3U kit

4U kit

D

 

 

1

2

5

6

J2

Blower

FAN

1

2

5

6

Отзывы: