16
Agilent Intuvo 9000 GC Installation
1
Installing the GC
Table 2
Power cords and terminations
Country
Line
Voltage
Amp
Rating
Cable length
(m)
Termination type
Plug
Termination
Australia
240
10
2.5
AS 3112
China
220
10
4.5
GB 1002
Europe, Korea
220 / 230 /
240
10
2.5
CEE 7/7
Type F
Switzerland
220
16
2.5
SEC Type 12
India, South Africa
220 / 230 /
240
10
4.5
IEC 83-B1
Israel
230
10
2.5
Israeli SI32
Japan
120
*
15
2.5
NEMA 5-15P
Содержание Intuvo 9000
Страница 1: ...Agilent Technologies Agilent Intuvo 9000 Gas Chromatograph Installation and First Startup...
Страница 6: ...6 Agilent Intuvo 9000 GC Installation...
Страница 25: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 25 3 Reinstall the GC covers...
Страница 26: ...26 Agilent Intuvo 9000 GC Installation 1 Installing the GC Connect the power cord and LAN cable LAN...
Страница 27: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 27 Turn on the GC...
Страница 29: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 29...
Страница 52: ...52 Agilent Intuvo 9000 GC Installation 1 Installing the GC Detector cover Vent chimney Screw O Ring...
Страница 84: ...84 Agilent Intuvo 9000 GC Installation 1 Installing the GC 8 Close the GC front door...
Страница 114: ...Agilent Technologies...