15
IDP-10 Dry Scroll Vacuum Pump
DRAF
T 1/13/17
a
Figure 6 Outline Drawing and Principal Items
To mount from the 1/4" through hole mounting holes suit-
able for 1/4" or M6 hardware, first remove rubber feet
secured by M3 hardware.
Figure 7 Feet Label
1. Front Cowling Screws; M8 (3)
2. Front Cowling
3. Inlet (NW25)
4. Inlet Screen
5. Exhaust Adapter NW16
6. Gas Ballast Port 1 (1/8" NPT). See “Gas Ballast” on
7. Gas Ballast Port 2 (1/8" NPT) See “Gas Ballast” on
8. Main Cowling
9. Mounting Holes: (4) through holes for 1/4" or M6
Hardware
10. Rear Cowling
11. KA40 Phillips PT hardware (6)
12. On/Off Switch
13. IO Control
14. Power Connection (IEC-320)
15. Hour Meter
Unpacking and Inspection
1. Orient the shipping container with
This End Up
on top.
2. Open the box and carefully lift the IDP-10 out of the
box.
3. Save the carton and all packing materials.
4. Inspect the pump for damage. If there is shipping
damage, contact the freight carrier and your local
Agilent sales office immediately.
WARNING
The pump is a heavy object. To avoid
muscle strain or back injury, use lifting
aides and proper lifting techniques
when removing or replacing.
Содержание IDP 10
Страница 4: ...IDP 10 Dry Scroll Vacuum Pump This page intentionally left blank D R A F T 1 1 3 1 7...
Страница 6: ...IDP 10 Dry Scroll Vacuum Pump This page intentionally left blank D R A F T 1 1 2 1 7...
Страница 34: ...IDP 10 Dry Scroll Vacuum Pump This page intentionally left blank D R A F T 1 1 2 1 7...
Страница 35: ...IDP 10 Dry Scroll Vacuum Pump This page intentionally left blank...