Operation
Agilent Cary 600 Series FTIR Spectrometers and Microscopes User’s Guide
37
To fill the spectrometer Dewar with liquid nitrogen:
1
Turn on the spectrometer power switch located on the rear of the
spectrometer.
NOTE
If the spectrometer has been turned off for an extended period, it will take about
30 minutes to reach its operating temperature. (If you collect data before the
spectrometer has reached operating temperature, your data may not be
accurate.)
2
If you have a cryogenically-cooled detector (MCT or InSb), fill its
Dewar with liquid nitrogen as follows:
WARNING
Extreme Cold Hazard
Liquid nitrogen is very cold and can cause damage to the human body. Use
appropriate protective equipment when handling liquid nitrogen.
a
Raise the spectrometer cover. The Dewar access hole is on
the right rear of the detector compartment cover.
Figure 13.
Dewar hole on spectrometer
Dewar fill hole
Detector compartment cover –
raise spectrometer cover to
access.
Содержание Cary 600 Series
Страница 1: ...Agilent Cary 600 Series FTIR Spectrometers and Microscopes User s Guide...
Страница 49: ......