![Agilent Technologies 8890 Скачать руководство пользователя страница 97](http://html.mh-extra.com/html/agilent-technologies/8890/8890_maintaining-manual_2867678097.webp)
6
Maintaining the Purged Packed Inlet
To Install a Packed Glass Column
Maintaining Your GC
97
To Install a Packed Glass Column
1
Gather the following:
•
9/16-inch wrench
•
Two 1/4-inch brass nuts, see
“Consumables and Parts for the Purged Packed Inlet”
•
Two 1/4-inch Vespel/graphite ferrules
•
Lint-free gloves
2
Place GC in maintenance mode:
Maintenance > Instrument > Perform Maintenance >
Maintenance Mode > Start Maintenance.
Wait for the GC to become ready.
WARNING
Be careful! The oven, inlet, and/or detector may be hot enough to cause burns. If the oven,
inlet, or detector is hot, wear heat-resistant gloves to protect your hands.
CAUTION
Wear clean, lint-free gloves to prevent contamination of parts with dirt and skin oils.
3
Assemble a brass nut and Vespel/graphite ferrule on each end of the column.
Glass columns must be simultaneously inserted into the inlet and detector and installed
parallel to the oven door. When conditioning the column, do not attach the column to the
detector.
4
If conditioning the column, insert the column into the purged packed inlet until it bottoms.
Withdraw the column 1 to 2 mm. Finger-tighten the inlet column nut. See
CAUTION
Overtightening the column nut or forcing it to bottom in either the inlet or detector may
shatter the column.
5
Tighten the inlet column nut 1/4 turn with a wrench.
WARNING
Do not use hydrogen as the carrier for conditioning! It could vent into the oven and present an
explosion hazard.
6
After conditioning, remove the column from the inlet.
7
Simultaneously insert the column into the inlet and detector fittings but
do not
force it. It
may be necessary to start the long end of the column in the inlet at an angle to clear the oven
floor.
Содержание 8890
Страница 1: ...Agilent 8890 Gas Chromatograph Maintaining Your Gas Chromatograph GC ...
Страница 8: ...8 Maintaining Your GC ...
Страница 22: ...2 Removing Covers To Remove the Electronics Cover 22 Maintaining Your GC ...
Страница 28: ...3 Maintaining the GC To Change the Hydrogen Sensor Calibration Gas Cylinder 28 Maintaining Your GC ...
Страница 48: ...4 Maintaining Capillary Columns To Remove the Ferrule From a CFT Fitting 48 Maintaining Your GC ...
Страница 120: ...7 Maintaining the COC Inlet To Bakeout Contaminants from the COC Inlet 120 Maintaining Your GC ...
Страница 142: ...8 Maintaining the MMI To Bakeout Contaminants from the MMI 142 Maintaining Your GC ...
Страница 178: ...10 Maintaining the VI To Bakeout Contaminants from the VI Inlet 178 Maintaining Your GC ...
Страница 208: ...12 Maintaining the TCD To Bakeout Contaminants from the TCD 208 Maintaining Your GC ...
Страница 240: ...14 Maintaining the ECD To Bakeout the ECD 240 Maintaining Your GC ...
Страница 264: ...16 Maintaining EPC Modules Installing or Replacing Frits in the PCM 264 Maintaining Your GC ...
Страница 276: ...17 Maintaining a Valve To Install the Upper Valve Box 276 Maintaining Your GC ...
Страница 282: ...www agilent com Agilent Technologies Inc 2019 First edition January 2019 G2790 90015 G3540 90015 ...